Pool restoration pt6

continued from Pool restoration pt5

Where do I begin?

I picked up the mixer and was lucky enough to have my friend Kyle come by to help the first day
Untitled by bradisdrab, on Flickr

He helped to figure it all out and with the scratch-coat. Basically the scratch coat is a thin and rough cement mix that adheres to the existing cement/plaster and created some more absorbant texture for the new plaster to bont to.

We started with mixing the measured water and SC powder in the new mixer, but it was pretty lumpy so I set up a drill-mixer as well
Untitled by bradisdrab, on Flickr

The SC is a pretty thin consistancy and I read some where rollers were the best way to apply, so thats what we did; set up a tray and got a pair of rollers;
Untitled by bradisdrab, on Flickr

Tiring, thankless work, but I was glad for the extra hands,
Untitled by bradisdrab, on Flickr

The two bags just barely covered it all, and took most of the day
Untitled by bradisdrab, on Flickr

Pretty dirty work, or so I thought, until I got to the next step…
Untitled by bradisdrab, on Flickr

The next day was another solid one, and time to begin the cement for real. I took what we’d figured out about mixing cement, but just me this time. deep breath, ok go.

Set up to mix the first bag near where the pile of bags was, using a bucked to support the 80lb bag while i fed it into the mixer, and preparing to split the mixed cement into the two buckets for ease of carrying…
Untitled by bradisdrab, on Flickr

but quickly realized the problems with carrying mixed cement all the way to the shallow end. I also noticed how much of a problem any spillage would be there, so after that batch I moved my mixing station to the other side
Untitled by bradisdrab, on Flickr

Had to start somewhere, so I picked a spot in the shade, and in the deep end. That way it might not have problems drying too fast and I could get the harder parts done first.

This was the first batch troweled up
Untitled by bradisdrab, on Flickr

I troweled with a 1/2in notched trowel to try and ensure that I had thick/even coverage.
Untitled by bradisdrab, on Flickr

One bag didn’t go very far, and took about an hour… one down 44 to go
Untitled by bradisdrab, on Flickr

Basically I’d do a first coat with the notched side, then let it set a bit while I did the next batch,
Untitled by bradisdrab, on Flickr

When the rough trowled sets up, I’d smooth trowel another layer over top… spraying the other parts to slow the drying process… here are two more batches
Untitled by bradisdrab, on Flickr

I even got a couple work-lights to let me work into part of the night,
Untitled by bradisdrab, on Flickr

and I thought I was dirty before
Untitled by bradisdrab, on Flickr

Even with gloves I managed to wear the skin off my finger, beware of little bits of quartz getting inside gloves, the lye from the cement might not help either…
Untitled by bradisdrab, on Flickr

Overall, not a bad start for Day 1, I wish it’d have been possible to do it all in one day, but it just was not.
Untitled by bradisdrab, on Flickr

The next day went much the same, more batches, applied, more area covered
As it dried and I rinsed/scrubbed away what was on the tile, and tht left some streaking in the dry cement, but it tended to vanish when it was wet, so I didn’t worry
Untitled by bradisdrab, on Flickr

The instructions from SGM about the Diamond brite had a detailed section about exposing the sgregate while it was wet, but since I didn’t have the time/skill to backtrack I opted not to worry about it and just plan to use the acid exposure process instead, and hope that helped with the tile cleaning and streaking as well…

Untitled by bradisdrab, on Flickr
Getting edges to match presented some challenge, but that was just further reason to go as quickly as I could

I knew it’d be a risk, with it drying as I work, but still scary to see small cracks hit, I found around 5 like this, around a couple inches in length. I could stress and obsessively fix each one as I go, but then I’d never finish. The plan had to be to just fix them all when I was done with the rest of the main application .
Untitled by bradisdrab, on Flickr

By the end of the second day I’d gotten the deep end’s walls done;
Untitled by bradisdrab, on Flickr

I also felt like I was getting the hang of the application;
http://instagram.com/p/sF67GePfSq/

This was the most tired I can remember ever being. Fuel…
Untitled by bradisdrab, on Flickr

Hands swollen and sore. Wearing the skin off my hands and arm where it rubs the bucket when I scooped. Mental note – make an armband.
Untitled by bradisdrab, on Flickr

This became my 2nd skin, doubled up work gloves with vinyl kitchen gloves and a cut-off sock arm band;
Untitled by bradisdrab, on Flickr

More progress;
Untitled by bradisdrab, on Flickr

I almost stopped there but I was determined to do as much as I could. I had stayed home from work, using up a vacation day on my birthday, so I HAD to do as much as I could, so with the work lights out again I managed to finish the stairs;

Untitled by bradisdrab, on Flickr

The following weekend and just the floor remaining, this all seemed well within reason;
Untitled by bradisdrab, on Flickr

A lot more surface area to cover, but not having to sling it against the wall I could cover more faster;
Untitled by bradisdrab, on Flickr

I never did make spiked shoes, but I found that by setting sponges strategically I would have places to step
Untitled by bradisdrab, on Flickr

You can see that I’ve also been chiseling out the cracks a bit too

Untitled by bradisdrab, on Flickr

The last night’s work, filling the last corner of the floor.
Untitled by bradisdrab, on Flickr

Touchups and covering up any thin spots, by this point I was in my socks, hopping from sponge to sponge
Untitled by bradisdrab, on Flickr

The last day!
I started with a full acid wash;
Untitled by bradisdrab, on Flickr

The cement was looking good at this point, and I was feeling pretty good abput it again, but it revealed a couple more thin spots,
Untitled by bradisdrab, on Flickr

So I chiseled them down to make sure the patches would stick, I also took a wirebrush on an angle grinder to some of the rough patches.
Untitled by bradisdrab, on Flickr

While I was doing that the guys came by and installed my new filter grids, timers, and pump. One of the few things I wasn’t sure I could do myself.

Just the last patches to do here;
Just finished the last of the patching, plastering and acid washing, by bradisdrab, on Flickr

Six solid days, thirty-two batches, over a TON; (2500lbs) of cement mixed and plastered by hand.
I did the last patches then had to walk away. It has to be done eventually and knew I could keep chipping out bits, looking for cracks, tapping to find hollow spots and just drive myself crazy.
It took me a few days to talk myself into calling it finished.

I started the water on thur night, Fri morning it was still going;
Untitled by bradisdrab, on Flickr
Friday night;
Untitled by bradisdrab, on Flickr

And filled!
Untitled by bradisdrab, on Flickr

We got our first swim in on Labor day!
After all that work, its pretty amazing to finally go for a swim. by bradisdrab, on Flickr
Untitled by bradisdrab, on Flickr

Filter running now, and I’m just learning how to ballance the chemistry, still some things to do, like sealing the expansion joints around the coping, but its close enough to call it done!
Untitled by bradisdrab, on Flickr

And we had the retaining wall put in as well, I think the stone ended up matching the tile pretty well after all;
Untitled by bradisdrab, on Flickr

Untitled by bradisdrab, on Flickr

Thank you all for reading along and encouraging my progress!


Pool restoration pt5

continued from Pool restoration pt 4

Next is the tile line. This is the fun part, where its becoming about the final look, the aesthetics, and not just the steps needed to fix the structure.

We’d been bouncing ideas around for awhile, and went to about five different places to look at them in person, eventually narrowing it down to four tiles. I put this in the parking lot to get a sun lit picture with light curb to simulate the coping and tar for the dark plaster I’ll be using;
Untitled by bradisdrab, on Flickr

I asked friends and family and the consensus was the third one, with the hint of blue, but at 6x the cost I couldn’t rationalize it.

We ended up planning a combination of the first two. These ones were just porcelain tiles, but since we live in CA and don’t have to deal with freezing or extremes it shouldn’t be such an issue.;
Untitled by bradisdrab, on Flickr

The green is slightly larger than the rust/orange, so I planned to space them eveny and use it as an accent.
Untitled by bradisdrab, on Flickr

One of the reasons we settled on these is because it would go well weth the slate facade we were thinking of using on the retaining walls around the yard.
Untitled by bradisdrab, on Flickr
I also grabbed some quarter round for the step edges and such.

Holding it up I could tell the curves were too tight for tiles that large;
Untitled by bradisdrab, on Flickr

That could only mean one thing, time to head back to Harbor freight!
Tile saw! I love being so close to #harborfreight by bradisdrab, on Flickr

I managed to get this tile saw for a deal, and started chopping some of the tiles in half to fit the curve, it ended up getting pretty late the first night when I finished putting up the first tiles,
Untitled by bradisdrab, on Flickr

but I managed to get pretty far considering I started late and had to make a few supply runs;
Untitled by bradisdrab, on Flickr

I used 1/8 plastic spacers, and if I’d had it to do over again I’d have pulled them back out as the mortar dried rather than leaving them in to dry,
Untitled by bradisdrab, on Flickr

but overall I’m happy with how it was coming along;
Untitled by bradisdrab, on Flickr

Next was the main drain, I’ve heard it didn’t *need* to be replaced, but I figured while I was updating everything else, why not?;
Untitled by bradisdrab, on Flickr

I pulled it out, and some of the plaster around it was still a bit funky;
Untitled by bradisdrab, on Flickr

I ground out the bad stuff and prepped it for the new cover;
Untitled by bradisdrab, on Flickr

and cemented it into place;
Untitled by bradisdrab, on Flickr

Another solid day’s work, with some help from my friend Kyle, and we’d managed to get most of the way across the pool.
Untitled by bradisdrab, on Flickr

My fiance Leslie made some time to help with the tile for the deep end and saved me a ton of time, since I could stay on the ladder and she could prep, mix mortar, cut tiles, or pass me whatever tool I needed.
Untitled by bradisdrab, on Flickr

Its hard to tell in the photos, but I realized at this stage that the pool itself isn’t centered/symetrical. the diving board, light and drain don’t line up with the steps. I’m not overly troubled by this, but its an interesting observation, and something to keep in mind for lining up the last of the tiles.

Since it was a favorite we placed the blue tile in the center as an accent and worked the pattern out to the sides from there. That way we wouldn’t end up with an offset tile.
Untitled by bradisdrab, on Flickr

We worked until we reached the skimmer ;
Untitled by bradisdrab, on Flickr

Wasn’t sure what to do about the skimmer, all along had been trying to convince myself to leave it tiled white, because it seemed like a lot of work;
Untitled by bradisdrab, on Flickr

But deep down I knew I’d always look at it and regret not going the extra mile, and Leslie was there to encourage me, so I chiseled it out;
Untitled by bradisdrab, on Flickr

We figured out the cuts and got it done in a couple hours, and even used some of the bullnose to make it a bit more slick looking;
Untitled by bradisdrab, on Flickr

The last of the quarter round bullnose I put as planned onto the steps;
Untitled by bradisdrab, on Flickr

And this is where I am at now!
Untitled by bradisdrab, on Flickr

The tile is all there and I’m planning to clean it up and grout it this weekend, hoping to replaster very soon…


Pool restoration pt2

Continued from (http://isdrab.com/2014/07/29/pool-restoration-pt1/)

Once we got the old tiles knocked off and a couple rounds of pressure washing in it was time to see hom much cleaner it’d get by acid etching the surface.

Here I’ve started the acid wash,

View this post on Instagram

Dropping acid

A post shared by Brad Isdrab (@bradisdrab) on

 

I was just doing it by hand, using a spray bottle and scrub-broom,

 

 

this was after the first gallon;
Untitled by bradisdrab, on Flickr

halfway done;
Untitled by bradisdrab, on Flickr

after etching through the dark/black stains I could see more to do, and I found the Anthony Pools tile;
Untitled by bradisdrab, on Flickr

It was in doing the second half that I figured out a better way of applying the acid; using a super soaker!
Untitled by bradisdrab, on Flickr

After acid washing the whole thing, and continuing to remove old/bad/delaminated plaster, basically anything that sounded hollow, was stained/softer than the rest;

View this post on Instagram

Chisel out the old and crumbling

A post shared by Brad Isdrab (@bradisdrab) on


Untitled by bradisdrab, on Flickr

(continued)